top of page

Features

  • Chilled Water Buffer Tanks  (ZCBT) are designed for use in chilled water systems with insufficient water volume capacity

  • Zilmet Hot Water Buffer Tanks (ZHBT) are designed for us with today's high efficiency systems that have low mass boilers

  • Integral Ring Stand for Vertical Installation

  • Top Air Vent Connection

  • Optional :  1/2" Elastomeric insulation , weather resistant coating

  • Available with 1/2" - 2" NPT connections

  • Available in either 2 or 4 ports

  • 1" - 20" flange connections also available

Buffer Tanks

(ZCBT, ZHBT)

Literature

Need help with sizing?
Check out our Sizing Tools or Literature below
bottom of page